Popular Questions

Got a question? We’re here to help.

  • Can I use my existing chimney?

    You can use an existing chimney without any need of a liner if it has a concrete or clay segmented liner. Any other flue should have a liner installed. But all stoves work better with a liner connected all the way from the chimney pot to the stove.

  • How do I know what kW to choose from?

    Any house built before 2008 can have upto 5kW of stove without the need for air vents or an external air system. 

    Houses built after 2008 will need either air vents or direct air for any kW stove because they are sealed so much even a lit match could exhaust the oxygen supply!

  • How eco friendly are these?

    All our stoves on sale, and all modern stoves, are built to the latest Eco Design standards to be as efficient as possible and burn in a way that limits particulate matter from the burn being released into the atmosphere.

GUARANTEE

Five year guarantee on all installations.

Where to start...

  • 1. Send a request

    Describe the item or answer the question so that site visitors who are interested get more information. You can emphasize this text with bullets, italics or bold, and add links.
  • 2. Take measurements

    Describe the item or answer the question so that site visitors who are interested get more information. You can emphasize this text with bullets, italics or bold, and add links.
  • 3. Approve budget

    Describe the item or answer the question so that site visitors who are interested get more information. You can emphasize this text with bullets, italics or bold, and add links.
  • 4. Start project

    Describe the item or answer the question so that site visitors who are interested get more information. You can emphasize this text with bullets, italics or bold, and add links.
  • 5. Finish on schedule

    Describe the item or answer the question so that site visitors who are interested get more information. You can emphasize this text with bullets, italics or bold, and add links.

Pinnacle Fireplaces

is part of Pinnacle Building Maintenance Ltd

Brief Introduction to Pinnacle Building Maintenance and its connection to Pinnacle Fireplaces.

xxxxx

xxxxx

xxxxx

CASE STUDY

This project was particularly interesting as we were opening up the fireplace, resurfacing the wall with a smooth finish, installing a ................ wood burning stove, and finishing up the hearth in marble.

Project Complete time : 2 weeks

Budget : under £0000

Installation :  Saltfire ST-X5

CASE STUDY

This project required the careful removal of a period fireplace, opening up the space and replacing the brickwork and leaving an 'open brick' finish, installing a ................ wood burning stove, and finishing up the hearth in slate.

Parkray Aspect 4 Compact installed in March, Cambridgeshire.  Liner fitted was a Midflex 904L steel - Midtherm Flue Systems Ltd.


Project Complete time : 2 weeks

Budget : under £0000

Installation :  Saltfire ST-X5

CASE STUDY

We recently installed this ST-X5 in Wisbech, Cambridgeshire. It is our most popular multi-fuel stove. It also comes in a wide version but this one is £999 including VAT. We have this one on show, along with the wide version, at our showroom in March.

Project Complete time : 2 weeks

Budget : under £0000

Installation :  Saltfire ST-X5